Serious project preparation
Use this when the project is moving beyond inspiration and early feasibility.
The Complete Project Package is intended for clients who already prefer a Soleta model and need a stronger basis for local review, contractor conversations, EasyKit scope discussion, and project coordination.
It helps move the project from idea to structured preparation, while still requiring local professionals to review regulations, engineering, permits, foundation, MEP systems, and site-specific conditions.
Use this when the project is moving beyond inspiration and early feasibility.
Give local professionals a more complete starting point for their own review.
Discuss scope, responsibilities, and local costs with more clarity.
Create a stronger basis for future EasyKit Core or EasyKit Extended discussions.
You have moved beyond browsing and want to prepare that model more seriously.
Early planning information is no longer enough for the next step.
You want local professionals to evaluate feasibility, adaptation, and responsibilities.
You need a better basis for discussions with builders or assembly teams.
EasyKit scope is easier to discuss when the documentation path is clearer.
You want to reduce ambiguity before requesting a quote or larger package.
Complete Project documentation is stronger than early planning information, but it does not automatically solve local legal, technical, or construction responsibilities.
Authorities may require local documents, signatures, calculations, and procedures.
Local engineers must confirm structure, loads, climate, foundation, and code compliance.
Soil, slope, drainage, frost, and local construction standards remain site-specific.
Mechanical, electrical, plumbing, heating, cooling, ventilation, and utilities are usually local.
Local labour, site management, safety, tools, and inspections are not automatically included.
EasyKit scope, production, transport, taxes, and contract terms are confirmed separately.
Final contents are confirmed per model and package version. The Complete Project Package may include:
Package contents are indicative placeholders
Package contents are indicative placeholders until the final file structure and scope are verified.
The Complete Project Package does not automatically include:
This package is more useful when the project direction is already reasonably clear.
Digital project documentation package — preview
€2,000–€3,000
Final package files, checkout, tax handling, and delivery policy pending.
For clients preparing local review, contractor input, EasyKit discussions, and a more structured Soleta build path.
Selected product
Complete Project Package — preview
Estimated subtotal
€2,000–€3,000 placeholder
Checkout status
Preview only — buying, basket, and file delivery will be enabled after package files, prices, tax handling, refund rules, and order policies are verified.
Best stage
Planning Information Package
Early review
Complete Project Package
Serious build preparation
Model overview
Planning Information Package
Included
Complete Project Package
Included
Basic layout info
Planning Information Package
Included
Complete Project Package
Included
Early planning notes
Planning Information Package
Included
Complete Project Package
Included
Extended documentation
Planning Information Package
Not included / limited
Complete Project Package
Included / extended
Local review basis
Planning Information Package
Basic
Complete Project Package
Stronger
EasyKit discussion basis
Planning Information Package
Limited
Complete Project Package
Better basis
Contractor pricing basis
Planning Information Package
Limited
Complete Project Package
Better basis
Assembly planning basis
Planning Information Package
Limited
Complete Project Package
Better basis
Local engineering replacement
Planning Information Package
Not included
Complete Project Package
Not included
Building permit guarantee
Planning Information Package
Not included
Complete Project Package
Not included
You want a stronger documentation base before talking to local builders or assembly teams.
You need local professionals to understand the model before adapting it to regional rules.
You want to move toward EasyKit Core or EasyKit Extended with fewer unknowns.
You need better information for timeline, responsibilities, local team, and site preparation.
Planning Information is no longer enough for your project stage.
Complete documentation still needs local review and legal acceptance.
Engineering requirements depend on country, climate, soil, loads, and local codes.
EasyKit scope and production are separate commercial and technical steps.
Foundation depends on real soil, slope, frost, drainage, and local standards.
Mechanical, electrical, plumbing, heating, cooling, ventilation, and drainage remain major local responsibilities.
The package makes sense only when the model direction is reasonably clear.
It may provide a stronger documentation base, but local professionals must confirm what is required before construction.
Not universally. Permit requirements vary by country, region, municipality, and project type.
No. Local engineering review and legally required signatures remain necessary.
It may be the better path before EasyKit discussions, but final requirements depend on model, scope, and project stage.
Upgrade policy is to be confirmed. Future upgrade or credit rules may be added after package pricing and order policies are verified.
Not automatically. These are typically local responsibilities unless specifically included in a verified package.
No. Current pricing is an indicative placeholder until package files, model scope, and order rules are verified.
Use the Complete Project Package when your project is moving beyond early review and you need a better basis for local adaptation, contractor input, EasyKit discussions, and project coordination.